Jan 17 2014

It Worked!

Tonight, the Build team continued to build the drive train while half of the design team worked on getting more precise data for the a different option of propultion which we will use if our sling shot method does not pan out.

The other half of design team has  been working diligently to finalize the complicated equations which will allow the team to know the number of latex-free bands needed to launch the ball.

Programing continued to work with the variable pressure systems. This is one of the resources we hope to utilize on the robot we are working towards. The electrical team helped programming by running all the wires which connect the control board to the variable pressure systems.